Violation Detail
Standard Cited: 19260451 E09 IV General requirements.
Inspection Nr: 923786.015
Citation: 01003B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 09/10/2013
Nr Instances: 1
Nr Exposed: 8
Abatement Date: 09/28/2013
Gravity: 10
Report ID: 0316100
Contest Date:
Final Order: 10/02/2013
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Z: Issued | 09/10/2013 | $0.00 | 09/28/2013 | Serious |
Text For Citation: 01 Item/Group: 003B Hazard:
29 CFR 1926.451(e)(9)(iv): Cross braces on tubular welded frame scaffolds were used as a means of access or egress: a) On July 9, 2013 and at times prior thereto; eastside of building, employees were observed climbing the cross braces of the scaffold system exposing themselves to a 20-30 foot fall. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.