Violation Detail

Standard Cited: 19100269 C Electric Power Generation, Transmission, and Distribution.

Inspection Nr: 900009.015

Citation: 01003B

Citation Type: Serious

Abatement Status: Abatement Completed

Initial Penalty: $7,000.00

Current Penalty: $0.00

Issuance Date: 09/24/2013

Nr Instances: 1

Nr Exposed: 9

Abatement Date: 10/24/2013

Gravity: 10

Report ID: 0418200

Contest Date: 11/04/2013

Final Order: 12/05/2014

Related Event Code (REC):

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty F: Formal Settlement 12/05/2014 $0.00 10/24/2013 Serious  
Penalty C: Contested 12/30/2013 $7,000.00 10/24/2013 Serious  
Penalty Z: Issued 09/24/2013 $7,000.00 10/24/2013 Serious  

Text For Citation: 01 Item/Group: 003B Hazard:

29 CFR 1910.269(c): The employee in charge did not conduct a job briefing with the employees involved before they started each job, including at least the following subjects: hazards associated with the job, work procedures involved, special precautions, energy source controls, and personal protective equipment requirements. a. The Operator Team Leader did not conduct a job safety briefing with the Boiler Turbine Operators assigned to purge hydrogen from the Unit 2 generator and re-pressure it with 30 psig shop air.

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.