Violation Detail
Standard Cited: 19100252 A03 II General requirements.
Inspection Nr: 686738.015
Citation: 01003B
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 04/11/2013
Nr Instances: 1
Nr Exposed: 1
Abatement Date:
Gravity: 10
Report ID: 0316700
Contest Date:
Final Order: 05/01/2013
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/01/2013 | $0.00 | Serious | ||
| Penalty | Z: Issued | 04/11/2013 | $0.00 | Serious |
Text For Citation: 01 Item/Group: 003B Hazard:
29 CFR 1910.252(a)(3)(ii): All hollow spaces, cavities, or containers were not vented to permit the escape of air or gases before preheating, cutting, or welding was performed: (a) CONFER TRUCKING, MAINTENANCE GARAGE - The employer did not make certain that employee(s) cutting fifty-five (55) gallon drums used to store waste oil, removed the bung to allow the escape of air or gases, thereby exposing employee(s) to serious injury or death, on or about October 15, 2012, and at times prior. No abatement certification or documentation required.
Translate