Violation Detail
Standard Cited: 19100219 C04 II Mechanical power-transmission apparatus.
Inspection Nr: 1788363.015
Citation: 01003B
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 12/09/2024
Nr Instances: 1
Nr Exposed: 25
Abatement Date:
Gravity: 5
Report ID: 0111100
Contest Date:
Final Order: 12/30/2024
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 12/30/2024 | $0.00 | Serious | ||
Penalty | Z: Issued | 12/09/2024 | $0.00 | Serious |
Text For Citation: 01 Item/Group: 003B Hazard:
29 CFR 1910.219(c)(4)(ii): The unused keyway(s) of projecting shaft end(s) were not filled up or covered: Plant 2 - The employer was operating a conveyor on the sorting line with a half-inch shaft protruding Three inches past the housing with an exposed keyway.