Violation Detail
Standard Cited: 19100107 B02 Spray finishing using flammable and combustible materials.
Inspection Nr: 1784023.015
Citation: 01003B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 01/07/2025
Nr Instances: 2
Nr Exposed: 3
Abatement Date: 02/10/2025
Gravity: 5
Report ID: 0728900
Contest Date:
Final Order: 01/28/2025
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 01/28/2025 | $0.00 | 02/10/2025 | Serious | |
Penalty | Z: Issued | 01/07/2025 | $0.00 | 02/10/2025 | Serious |
Text For Citation: 01 Item/Group: 003B Hazard:
29 CFR 1910.107(b)(2):The interior surfaces of spray booths were not smooth and continuous without edges and otherwise designed to prevent pocketing of residues and facilitate cleaning and washing without injury. Employees were exposed to abrasion hazards. This was most recently documented on or about October 24, 2024 at 7050 North 97th Circle Plaza, Omaha, Nebraska. Spray booths in the finishing area had screws protruding into the interior of the booth. Booths with protruding materials on the interior surfaces include but are not limited to.. A) Spray booth labeled 'Paint' B) Spray booth labeled 'Clear Coat' (North)