Violation Detail
Standard Cited: 19100147 D06 The control of hazardous energy (lockout/tagout).
Inspection Nr: 1781440.015
Citation: 01003B
Citation Type: Serious
Abatement Status:
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 04/10/2025
Nr Instances: 1
Nr Exposed: 7
Abatement Date: 05/22/2025
Gravity: 10
Report ID: 0626700
Contest Date: 05/02/2025
Final Order:
Related Event Code (REC): A
Emphasis:
Substance: 1480
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | C: Contested | 05/08/2025 | $0.00 | 05/22/2025 | Serious | |
Penalty | Z: Issued | 04/10/2025 | $0.00 | 05/22/2025 | Serious |
Text For Citation: 01 Item/Group: 003B Hazard:
29 CFR 1910.147(d)(6): Prior to starting work on machines or equipment that have been locked out or tagged out, the authorized employee did not verify that isolation and de-energization of the machine or equipment had been accomplished. On or about October 10, 2024, in ARU #6/7 at Deer Park Refinery Limited located in Deer Park, TX, the contract employer (Repcon, Inc.) did not verify that isolation and de-energization of 12-inch CAG header line/flange had been accomplished prior to starting work on the line.