Standard Cited: 19100219 F01 Mechanical power-transmission apparatus.
Inspection Nr: 1748576.015
Citation: 01003B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 10/16/2024
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 12/16/2024
Gravity: 5
Report ID: 0523400
Contest Date:
Final Order: 11/12/2024
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 11/12/2024 | $0.00 | 12/16/2024 | Serious | |
| Penalty | Z: Issued | 10/16/2024 | $0.00 | 11/19/2024 | Serious |
Text For Citation: 01 Item/Group: 003B Hazard:
29 CFR 1910.219(f)(1): Gear(s) were not guarded by a complete enclosure or by one of the methods specified in 29 CFR 1910.219(f)(1)(ii) and (f)(1)(iii): (a) On or about May 16, 2024, and dates prior directly next to the powered Take-Up Reels located at the end of furnace line #1: The employer did not provide adequate guarding to prevent employee exposure to rotating gears used to power the fixtures that wind product into coils, exposing the the employees to caught-in and crushing hazards.