Violation Detail
Standard Cited: 19100124 B04 II
Inspection Nr: 1737659.015
Citation: 01003B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 08/28/2024
Nr Instances: 1
Nr Exposed: 5
Abatement Date: 09/24/2024
Gravity: 5
Report ID: 0336000
Contest Date:
Final Order: 09/18/2024
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/18/2024 | $0.00 | 09/24/2024 | Serious | |
Penalty | Z: Issued | 08/28/2024 | $0.00 | 09/24/2024 | Serious |
Text For Citation: 01 Item/Group: 003B Hazard:
29 CFR 1910.124(b)(4)(ii): Mechanical ventilation did not conform to NFPA 34-1995, Standard for Dip Tanks Containing Flammable or Combustible Liquids Section 7.7: a.) Alpha Precision Group, LLC dba Alpha Sintered Metals, Kohler room, on or about 3/27/24 and at times prior thereto: A section of the ventilation duct work inside the enclosure was constructed of a flexible plastic section. All equipment for removing flammable vapors must be from steel construction in accordance with NFPA 34. ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below). This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.