Violation Detail
Standard Cited: 19261416 D03 II D
This violation item has been deleted.
Inspection Nr: 1643655.015
Citation: 01003B
Citation Type: Serious
Abatement Status:
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 06/07/2023
Nr Instances: 2
Nr Exposed: 4
Abatement Date: 07/26/2023
Gravity: 5
Report ID: 0627700
Contest Date:
Final Order: 06/30/2023
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/30/2023 | $0.00 | 07/26/2023 | Serious | |
Penalty | Z: Issued | 06/07/2023 | $0.00 | 07/26/2023 | Serious |
Text For Citation: 01 Item/Group: 003B Hazard:
29 CFR 1926.1416((d)(3)(ii)(D): Temporary alternative measures. The cable was not clearly marked, or a spotter was not used, so that the cable could have been seen by the operator at a point that would have given the operator time to stop the hoist to prevent two-blocking: On or about January 9, 2023, at the job site, two lattice boom cranes used to lift a bridge beam were not provided with an anti-two-blocking device and the cable was not clearly marked to prevent two-blocking during operation. Employees were exposed to struck-by hazards during crane operations.