Violation Detail
Standard Cited: 19100147 C04 II B The control of hazardous energy (lockout/tagout).
This violation item has been deleted.
Inspection Nr: 1631283.015
Citation: 01003B
Citation Type: Serious
Abatement Status:
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 01/04/2023
Nr Instances: 4
Nr Exposed: 3
Abatement Date: 02/02/2023
Gravity: 5
Report ID: 0636900
Contest Date:
Final Order: 01/25/2023
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 01/25/2023 | $0.00 | 02/02/2023 | Serious | |
| Penalty | Z: Issued | 01/04/2023 | $0.00 | 02/02/2023 | Serious |
Text For Citation: 01 Item/Group: 003B Hazard:
29 CFR 1910.147(c)(4)(ii)(B): The energy control procedures did not clearly and specifically outline the steps for shutting down, isolating, blocking and securing machines or equipment to control hazardous energy: On or about October 28, 2022, and at time prior thereto, the employer's SOP(s), Standard Work Visual Instructions also referred to as Inch Safe procedures did not clearly and specifically outline the steps for shutting down, isolating, blocking and securing the following equipment: a) Checking Surveillance System - The SOP does not include how to lock out all the energy sources. It only indicates "with stop button down". b) Start-up - The SOP does not include how to lock out all the energy sources. It only indicates "Start machine and run to 200 rpm Speed". c) Patch Hoist - The SOP does not include how to lock out all the energy sources. It only indicates "stop the machine... with the stop button down". d) Pulling out 'Out of Tolerance' envelopes. It only indicates "machines need to be shut down"