Violation Detail
Standard Cited: 19100269 L08 V Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1487317.015
Citation: 01003B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 10/19/2020
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 12/29/2020
Gravity: 10
Report ID: 0418400
Contest Date:
Final Order: 11/12/2020
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 11/12/2020 | $0.00 | 12/29/2020 | Serious | |
| Penalty | Z: Issued | 10/19/2020 | $0.00 | 12/29/2020 | Serious |
Text For Citation: 01 Item/Group: 003B Hazard:
29 CFR 1910.269(l)(8)(v): The employer did not ensure that each employee exposed to hazards from electric arcs wore protective clothing and other protective equipment that had an arc rating greater than or equal to the heat energy estimated under paragraph (l)(8)(ii) of this section whenever that estimate exceeded 2.0 Cal/cm2: A) SOLAmerica Solar Farm, on or about August 6, 2020, an employee was required to take thermal images of the exposed interior of an energized 600 VAC disconnect box. The employer failed to provide employees with arc flash personal protective equipment, thereby exposing the employee to an arc flash hazard.
Translate