Violation Detail
Standard Cited: 19100147 C07 I B The control of hazardous energy (lockout/tagout).
Inspection Nr: 1451131.015
Citation: 01003B
Citation Type: Serious
Abatement Status: Not Completed - AD Discretion
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 03/16/2020
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 03/20/2020
Gravity: 10
Report ID: 0213100
Contest Date: 04/06/2020
Final Order: 11/02/2020
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 11/02/2020 | $0.00 | 03/20/2020 | Serious | |
Penalty | C: Contested | 04/13/2020 | $0.00 | 03/20/2020 | Serious | |
Penalty | Z: Issued | 03/16/2020 | $0.00 | 03/20/2020 | Serious |
Text For Citation: 01 Item/Group: 003B Hazard:
29 CFR 1910.147(c)(7)(i)(B): Affected employees were not instructed in the purpose and use of the energy control procedure: a) Duo Matic Machine - On or prior to December 13, 2019, employees operate the Duo Matic Machine (The Duo Matic Assembly System is manufactured by Viking Engineering and Development, Patent #3,945,549. The machine label also includes 950-30-1147). The company did not provide adequate training for affected employees.