Violation Detail
Standard Cited: 19260451 C03 General requirements.
Inspection Nr: 1440318.015
Citation: 01003B
Citation Type: Serious
Abatement Date: 02/19/2020 5
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 02/07/2020
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 10
Report ID: 0522500
Contest Date:
Final Order: 04/28/2020
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 02/07/2020 | $0.00 | 02/19/2020 | Serious |
Text For Citation: 01 Item/Group: 003B Hazard:
29 CFR 1926.451(c)(3): Supported scaffold poles, legs, posts, frames, and uprights shall be plumb and braced to prevent swaying and displacement. a. On or about October 25, 2019, located at 34 Miami Avenue in Columbus, Ohio, employees were working a pump jack scaffold without its vertical poles plumb, thereby exposing the employees to a scaffold collapse and fall hazard of 18 feet.