Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1425480.015
Citation: 01003B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 10/11/2019
Nr Instances: 3
Nr Exposed: 50
Abatement Date: 11/05/2019
Gravity: 10
Report ID: 0419400
Contest Date:
Final Order: 11/12/2019
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 11/12/2019 | $0.00 | 11/05/2019 | Serious | |
Penalty | Z: Issued | 10/11/2019 | $0.00 | 11/05/2019 | Serious |
Text For Citation: 01 Item/Group: 003B Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: (a) Facility - On or about August 21, 2019 the employer had not performed the required periodic inspection of their energy control procedures for equipment such as but not limited to, Minster presses, rivet machines, Jenfab Rivet Washer, prior to employees performing servicing and maintenance exposing employees to amputation hazards.