Standard Cited: 19100269 D02 V E Electric Power Generation, Transmission, and Distribution.
This violation item has been deleted.
Inspection Nr: 1425017.015
Citation: 01003B
Citation Type: Serious
Abatement Status: Not Completed - Worksite Changed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 09/03/2019
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 10/01/2019
Gravity: 5
Report ID: 0636900
Contest Date: 09/26/2019
Final Order: 03/13/2020
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | R: Review Commission | 03/13/2020 | $0.00 | 10/01/2019 | Serious | |
| Penalty | C: Contested | 03/03/2020 | $0.00 | 10/01/2019 | Serious | |
| Penalty | Z: Issued | 09/03/2019 | $0.00 | 10/01/2019 | Serious |
Text For Citation: 01 Item/Group: 003B Hazard:
29 CFR 1910.269(d)(2)(v)(E): The employer did not certify that periodic inspections of the energy control procedures had been performed on all types of electrical equipment or machines by listing the date of the inspection, the employees included in the inspection, and person performing the inspection. At the facility located at 12567 FM 3430 Vernon, Texas: the employer did not ensure periodic inspections were conducted to ensure the energy control procedures were followed. The employer did not list equipment, date of inspections and employee's performing the work. Employees were exposed to electrical shock and arc flash hazards.