Violation Detail
Standard Cited: 19100147 D03 The control of hazardous energy (lockout/tagout).
Inspection Nr: 1415647.015
Citation: 01003B
Citation Type: Serious
Abatement Date: 09/17/2019 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 07/31/2019
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC):
Gravity: 10
Report ID: 0729300
Contest Date:
Final Order: 08/19/2019
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/19/2019 | $0.00 | 09/17/2019 | Serious | |
Penalty | Z: Issued | 07/31/2019 | $0.00 | 09/17/2019 | Serious |
Text For Citation: 01 Item/Group: 003B Hazard:
29 CFR 1910.147(d)(3): All energy isolating devices that were needed to control the energy to the machine or equipment were not physically located and operated in such a manner as to isolate the machine or equipment from the energy source(s). At 1120 Mason Circle S., Pevely, Missouri, specifically inside of the Shipping/Receiving Area, the electrical energy supplying power to the LAN-TECH V Series Wrapping Machine, was not isolated whenever servicing has to occur. This violation was noted on 07/23/19.