Standard Cited: 19100269 C01 II Electric Power Generation, Transmission, and Distribution.
This violation item has been deleted.
Inspection Nr: 1412475.015
Citation: 01003B
Citation Type: Serious
Abatement Status:
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 12/23/2019
Nr Instances: 1
Nr Exposed: 5
Abatement Date: 01/09/2020
Gravity: 5
Report ID: 0625700
Contest Date:
Final Order: 01/23/2020
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 01/23/2020 | $0.00 | 01/09/2020 | Serious | |
Penalty | Z: Issued | 12/23/2019 | $0.00 | 01/09/2020 | Serious |
Text For Citation: 01 Item/Group: 003B Hazard:
29 CFR 1910.269(c)(1)(ii): The employer did not ensure that the employee in charge conducted a job briefing that met paragraphs (c)(2) though (c)(4) of this section with the employees involved before they start each job: On or about June 25, 2019, on the North side of an electrical power pole, the employer did not ensure that employees were servicing a down 14.4KVA power line without a job briefing or job assessment of the hazards associated with working on live electrical lines.