Violation Detail
Standard Cited: 19100303 C03 I General.
Inspection Nr: 1404743.015
Citation: 01003B
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 11/06/2019
Nr Instances: 1
Nr Exposed: 3
Abatement Date:
Gravity: 1
Report ID: 0418100
Contest Date:
Final Order: 12/03/2019
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 12/03/2019 | $0.00 | Serious | ||
Penalty | Z: Issued | 11/06/2019 | $0.00 | Serious |
Text For Citation: 01 Item/Group: 003B Hazard:
29 CFR 1910.303(c)(3)(i): All splices and joints and the free ends of the conductors were not covered with an insulation equivalent to that of the conductors or with an insulating device identified for the purpose. a) TP 12: On or about May 30, 2019, employees were exposed to electric shock hazards where an outlet was installed with a cable that had exposed copper.