Violation Detail
Standard Cited: 19100184 E03 I Slings.
Inspection Nr: 1345868.015
Citation: 01003B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 10/25/2018
Nr Instances: 1
Nr Exposed: 6
Abatement Date: 12/14/2018
Gravity: 5
Report ID: 0522500
Contest Date:
Final Order: 11/19/2018
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 11/19/2018 | $0.00 | 12/14/2018 | Serious | |
| Penalty | Z: Issued | 10/25/2018 | $0.00 | 11/14/2018 | Serious |
Text For Citation: 01 Item/Group: 003B Hazard:
29 CFR 1910.184(e)(3)(i): In addition to the inspection required by paragraph (d) of this section, a thorough periodic inspection of alloy steel chain slings in use shall be made on a regular basis, to be determined on the basis of (A) frequency of sling use; (B) severity of service conditions; (C) nature of lifts being made; and (D) experience gained on the service life of slings used in similar circumstances. Such inspections shall in no event be at intervals greater than once every 12 months. a. On and before September 12, 2018, in the HSP molding department, the employer did not ensure that the quadruple alloy steel chain sling in use was inspected at intervals not greater than once every 12 months. The sling was attached and used with a Gorbel 2 ton jib crane and Budgit 2 ton hoist.