Violation Detail
Standard Cited: 19100252 A03 II General requirements.
Inspection Nr: 1339455.015
Citation: 01003B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 01/31/2019
Nr Instances: 2
Nr Exposed: 1
Abatement Date: 03/20/2019
Gravity: 10
Report ID: 1032500
Contest Date:
Final Order: 02/27/2019
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 02/27/2019 | $0.00 | 03/20/2019 | Serious | |
| Penalty | Z: Issued | 01/31/2019 | $0.00 | 03/20/2019 | Serious |
Text For Citation: 01 Item/Group: 003B Hazard:
29 CFR 1910.252(a)(3)(ii): All hollow spaces, cavities or containers were not vented to permit the escape of air or gases before preheating, cutting or welding. a) On or about August 11th, 2018 or prior thereto: Entry was conducted into a 8000 gallon 1988 Beat Tanker DOT classified 306 trailer to weld a baffle. The employer did not evaluate respiratory or explosive hazards inside the tanker prior to entry. b) On or about August 14th, 2018 or prior thereto: Mig welding was conducted on a 8000 gallon 1988 Beat Tanker DOT classified 306 trailer to repair a vapor rail. The employer did not evaluate explosive hazards prior to welding. NOTE: Abatement certification and documentation are required for this item.