Violation Detail
Standard Cited: 19100305 G01 IV D Wiring methods, components, and equipment for general use.
Inspection Nr: 1302224.015
Citation: 01003B
Citation Type: Serious
Abatement Date: 09/28/2018 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 08/30/2018
Nr Instances: 1
Nr Exposed: 15
Related Event Code (REC):
Gravity: 5
Report ID: 0636900
Contest Date:
Final Order: 09/25/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/25/2018 | $0.00 | 09/28/2018 | Serious | |
Penalty | Z: Issued | 08/30/2018 | $0.00 | 09/28/2018 | Serious |
Text For Citation: 01 Item/Group: 003B Hazard:
29 CFR 1910.305(g)(1)(iv)(D): Flexible cords and cables were attached to building surfaces: On or about March 15, 2018, and times prior there to, at the north east corner outside of the facility, the employer did not ensure flexible cords were attached to building surfaces as permanent wiring to power equipment such as but not limited to the Torit Dust Collector exposing the employees to fire or electrical shock hazards.