Violation Detail
Standard Cited: 19100333 B02 Selection and use of work practices
Inspection Nr: 1217876.015
Citation: 01003B
Citation Type: Serious
Abatement Date: 07/17/2017 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 05/30/2017
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 5
Report ID: 0112000
Contest Date:
Final Order: 07/07/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/07/2017 | $0.00 | 07/17/2017 | Serious | |
Penalty | Z: Issued | 05/30/2017 | $0.00 | 07/17/2017 | Serious |
Text For Citation: 01 Item/Group: 003B Hazard:
29 CFR 1910.333(b)(2): While an employee was exposed to contact with parts of fixed electric equipment or circuits which were de-energized, the circuits energizing the parts were not locked out or tagged or both in accordance with the requirements of this paragraph (b) of 29 CFR 1910.333(b)(2): Main Plant: On, or about, March 17, 2017, the buss mounted disconnect for Machine 2701 had not been locked out while the wiring had been removed from the machine in order to turn the machine around.