Violation Detail
Standard Cited: 19260451 B01 General requirements.
Inspection Nr: 1183266.015
Citation: 01003B
Citation Type: Serious
Abatement Date: 03/22/2017 5
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 03/14/2017
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 5
Report ID: 0316400
Contest Date: 04/06/2017
Final Order: 08/20/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 08/20/2018 | $0.00 | 03/22/2017 | Serious | |
Penalty | C: Contested | 04/13/2017 | $0.00 | 03/22/2017 | Serious | |
Penalty | Z: Issued | 03/14/2017 | $0.00 | 03/22/2017 | Serious |
Text For Citation: 01 Item/Group: 003B Hazard:
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii): (a) 312 Old Goff Mountain Road: On or about October 11, 2016 and times prior, an employee performed framing work from a mobile scaffold up to 11ft. from the ground and the working levels were not fully planked.