Violation Detail
Standard Cited: 19100134 H04 I Respiratory Protection.
Inspection Nr: 1163157.015
Citation: 01003B
Citation Type: Serious
Abatement Status: Not Completed - Worksite Changed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 01/17/2017
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 02/10/2017
Gravity: 5
Report ID: 0316300
Contest Date:
Final Order: 03/31/2017
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Z: Issued | 01/17/2017 | $0.00 | 02/10/2017 | Serious |
Text For Citation: 01 Item/Group: 003B Hazard:
29 CFR 1910.134(h)(4)(i): Repairs or adjustments to respirators were not made using the respirator manufacturer's NIOSH-approved parts designed for that respirator: a) Colonna's Shipyard, Andrew J. Barberi : On or about 07/19/2016, repairs were not made using manufacturer's NIOSH approved parts in that stainless steel multipurpose hose clamps were used to connect the breathing tube and duct tape was used to secure the lens housing to the lens ring of a respirator. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Translate