Violation Detail
Standard Cited: 19260452 J01 Additional requirements applicable to specific types of scaffolds.
Inspection Nr: 997540.015
Citation: 01003A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $2,400.00
Current Penalty: $2,400.00
Issuance Date: 10/06/2014
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 10/14/2014
Gravity: 5
Report ID: 0625400
Contest Date:
Final Order: 11/07/2014
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Z: Issued | 10/06/2014 | $2,400.00 | 10/14/2014 | Serious |
Text For Citation: 01 Item/Group: 003A Hazard:
29 CFR 1926.452(j)(1): Pump jack brackets, braces, and accessories were not fabricated from metal plates and angles. Each pump jack bracket did not have two positive gripping mechanisms to prevent any failure or slippage. On or about October 01, 2014, the scaffolding system installed on the west side of the property under construction was supported only by lumber, exposing employees to the hazards of falls in the event of scaffold failure or slippage.