Violation Detail
Standard Cited: 19100119 F01 ID Process safety management of highly hazardous chemicals.
Inspection Nr: 314917840
Citation: 01003A
Citation Type: Other
Abatement Status: X
Initial Penalty: $4,000.00
Current Penalty:
Issuance Date: 07/27/2011
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 09/12/2011
Gravity: 05
Report ID: 0112300
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/23/2011 | 09/12/2011 | Other | ||
Penalty | Z: Issued | 07/27/2011 | $4,000.00 | 09/12/2011 | Serious |
Text For Citation: 01 Item/Group: 003A Hazard: CHEMNEP
29 CFR 1910.119(f)(1)(i)(D): The employer's written operating procedures covering the steps for each operating phase did not address emergency shutdown including the conditions under which emergency shutdown is required, and the assignment of shutdown responsibility to qualified operators to ensure that emergency shutdown is executed in a safe and timely manner: Establishment: The company's written operating procedures did not cover the steps which are to be followed during an emergency shutdown.