Violation Detail
Standard Cited: 19100119 J02 Process safety management of highly hazardous chemicals.
Inspection Nr: 314059460
Citation: 01003A
Citation Type: Serious
Abatement Date: 09/30/2011 X
Initial Penalty: $5,000.00
Current Penalty: $5,000.00
Issuance Date: 04/18/2011
Nr Instances: 1
Nr Exposed: 60
Related Event Code (REC): R
Gravity: 05
Report ID: 0728900
Contest Date:
Final Order:
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/12/2011 | $5,000.00 | 09/30/2011 | Serious | |
Penalty | Z: Issued | 04/18/2011 | $5,000.00 | 06/20/2011 | Serious |
Text For Citation: 01 Item/Group: 003A Hazard: CHEMNEP
29 CFR 1910.119(j)(2): ADM Milling Co. - Lincoln, NE - The employer did not establish and implement written procedures to maintain the on-going mechanical integrity of process equipment. Written procedures to maintain all components of the chlorine process equipment were incomplete and/or not included in the facility mechanical integrity program. Abatement certification is required for this violation. The abatement certification sheet is enclosed with the citations.ion