Violation Detail
Standard Cited: 19260451 G01 VI General requirements.
Inspection Nr: 1833046.015
Citation: 01003A
Citation Type: Serious
Abatement Status: Not Completed - Worksite Changed
Initial Penalty: $16,550.00
Current Penalty: $16,550.00
Issuance Date: 12/23/2025
Nr Instances: 4
Nr Exposed: 4
Abatement Date: 01/15/2026
Gravity: 10
Report ID: 0317000
Contest Date:
Final Order: 01/22/2026
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Z: Issued | 12/23/2025 | $16,550.00 | 01/15/2026 | Serious |
Text For Citation: 01 Item/Group: 003A Hazard:
29 CFR 1926.451(g)(1)(vi): Each employee performing overhand bricklaying operations from a supported scaffold was not protected from falling from all open sides and ends of the scaffold (except at the side next to the wall being laid) by the use of a personal fall arrest system or guardrail system (with minimum 200 pound toprail capacity): a) Jobsite located at or near 5800 City Ave. Philadelphia, PA- On or about June 24, 2025, employees were exposed to fall hazards of 60 feet in height while installing masonry units from outriggers on a Fraco Act 8 Mast Climbing Work Plaform that lacked guard railing on the ends. b) Jobsite located at or near 5800 City Ave. Philadelphia, PA- On or about June 24, 2025, employees were exposed to fall hazards of 60 feet in height while installing masonry units from outriggers on a fabricated frame scaffold that lacked guard railing on the ends. c) Jobsite located at or near 5800 City Ave. Philadelphia, PA- On or about June 24, 2025, employees were exposed to fall hazards of 60 feet in height from a fabricated frame scaffold that lacked guard railing on the end frames while installing masonry units. IN THE ALTERVINATIVE 29 CFR 1926.451(g)(4)(i): Guardrail systems shall be installed along all open sides and ends of platforms. Guardrail systems shall be installed before the scaffold is released for use by employees other than erection/dismantling crews. a) Jobsite located at or near 5800 City Ave. Philadelphia, PA- On or about June 24, 2025, employees were exposed to fall hazards of 60 feet in height while installing masonry units from outriggers on a Fraco Act 8 Mast Climbing Work Plaform that lacked guard railing on the ends. b) Jobsite located at or near 5800 City Ave. Philadelphia, PA- On or about June 24, 2025, employees were exposed to fall hazards of 60 feet in height while installing masonry units from outriggers on a fabricated frame scaffold that lacked guard railing on the ends. c) Jobsite located at or near 5800 City Ave. Philadelphia, PA- On or about June 24, 2025, employees were exposed to fall hazards of 60 feet in height from a fabricated frame scaffold that lacked guard railing on the end frames while installing masonry units.