Violation Detail
Standard Cited: 19100333 B02 II B Selection and use of work practices
Inspection Nr: 1832226.015
Citation: 01003A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $14,895.00
Current Penalty: $10,000.00
Issuance Date: 12/17/2025
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 03/30/2026
Gravity: 10
Report ID: 0625700
Contest Date:
Final Order: 01/29/2026
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 01/29/2026 | $10,000.00 | 03/30/2026 | Serious | |
| Penalty | Z: Issued | 12/17/2025 | $14,895.00 | 01/02/2026 | Serious |
Text For Citation: 01 Item/Group: 003A Hazard:
29 CFR 1910.333(b)(2)(ii)(B): The circuits and equipment to be worked on shall be disconnected from all electric energy sources. Control circuit devices, such as push buttons, selector switches, and interlocks, may not be used as the sole means for deenergizing circuits or equipment. Interlocks for electric equipment may not be used as a substitute for lockout and tagging procedures. a) On or about June 19, 2025 on the third floor of the building, an employee tasked with replacing ballast light with LED fixture removed the old ballast lighting without first deenergizing power to the fixture.