Violation Detail
Standard Cited: 19100333 B02 II A Selection and use of work practices
Inspection Nr: 1806333.015
Citation: 01003A
Citation Type: Serious
Abatement Status:
Initial Penalty: $16,550.00
Current Penalty: $16,550.00
Issuance Date: 08/21/2025
Nr Instances: 1
Nr Exposed: 6
Abatement Date: 10/09/2025
Gravity: 10
Report ID: 0214200
Contest Date: 09/17/2025
Final Order:
Related Event Code (REC): A;R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | C: Contested | 09/18/2025 | $16,550.00 | 10/09/2025 | Serious | |
| Penalty | Z: Issued | 08/21/2025 | $16,550.00 | 10/09/2025 | Serious |
Text For Citation: 01 Item/Group: 003A Hazard:
29 CFR 1910.333(b)(2)(ii)(A): Safe procedures for deenergizing circuits and equipment were not determined before circuits and equipment were deenergized: Location: 60 Earhart Drive. Newark, NJ 07114 - Rail Link SOP 11-12 a: The employer failed to develop and implement procedures for de-energizing equipment at the crossover section of the train rail-link system. Employees were exposed to electrocution hazards while replacing fuses in an electrical panel as a train was towed through the crossover, which caused an electrical backfeed into the panel. Violation occurred on or about February 25, 2025.
Translate