Violation Detail
Standard Cited: 19100219 C04 I Mechanical power-transmission apparatus.
Inspection Nr: 1788363.015
Citation: 01003A
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $15,970.00
Current Penalty: $7,985.00
Issuance Date: 12/09/2024
Nr Instances: 1
Nr Exposed: 25
Abatement Date:
Gravity: 10
Report ID: 0111100
Contest Date:
Final Order: 12/30/2024
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 12/30/2024 | $7,985.00 | Serious | ||
Penalty | Z: Issued | 12/09/2024 | $15,970.00 | Serious |
Text For Citation: 01 Item/Group: 003A Hazard:
29 CFR 1910.219(c)(4)(i): Unguarded projecting shaft ends did not present a smooth edge and end and projected more than one half the diameter of the shaft: Plant 2 - The employer was operating a conveyor on the sorting line with a keyed half-inch shaft protruding three inches past the housing.