Violation Detail
Standard Cited: 19100303 B02 General.
Inspection Nr: 1744349.015
Citation: 01003A
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $12,445.00
Current Penalty: $6,741.00
Issuance Date: 10/04/2024
Nr Instances: 1
Nr Exposed: 50
Abatement Date: 12/16/2024
Gravity: 5
Report ID: 0522000
Contest Date:
Final Order: 10/31/2024
Related Event Code (REC): C
Emphasis:
Substance: 0040
Substance: 0430
Substance: 1470
Substance: 1774
Substance: 2280
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 10/31/2024 | $6,741.00 | 12/16/2024 | Other | |
| Penalty | Z: Issued | 10/04/2024 | $12,445.00 | 10/24/2024 | Serious |
Text For Citation: 01 Item/Group: 003A Hazard:
29 CFR 1910.303(b)(2): Examination, installation, and use of equipment - Installation and use. Listed or labeled equipment shall be installed and used in accordance with any instructions included in the listing or labeling. (a) On or about April 29, 2024, the employer did not ensure flexible extension cords were used in accordance with the manufacturer's instructions. Flexible extension cords were connected together to supply power to a floor fan.
Translate