Violation Detail
Standard Cited: 19101200 E01 Hazard Communication.
Inspection Nr: 1731924.015
Citation: 01003A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $3,687.00
Current Penalty: $3,687.00
Issuance Date: 08/16/2024
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 09/12/2024
Gravity: 5
Report ID: 0317900
Contest Date:
Final Order: 09/12/2024
Related Event Code (REC): C
Emphasis:
Substance: 0040
Substance: 0689
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 09/12/2024 | $3,687.00 | 09/12/2024 | Serious | |
| Penalty | Z: Issued | 08/16/2024 | $3,687.00 | 09/12/2024 | Serious |
Text For Citation: 01 Item/Group: 003A Hazard:
29 CFR 1910.1200(e)(1): Employer had not developed or implemented a written hazard communication program included the requirements outlined in 29 CFR 1910.1200(e)(1)(i) and (e)(1)(ii): a) Bosio Metal Specialties - 409 Industrial Dr., North Wales, PA - On or about February 21, 2024, employees were exposed to hazardous chemicals, such as but not limited to operations involving laser burning on acrylic and stainless steel sheets, and the employer did not develop and implement a written hazard communication program as required. ABATEMENT NOTE: A written program shall include descriptions of how the criteria for the following will be met: 1. Labeling, pictograms, and other forms of warning; 2. Safety Data Sheets; 3. Employee information and training. Additionally, a list of hazardous chemicals known to be present in the workplace must be compiled. Methods used to inform employees of the hazards associated with non-routine tasks and the informing of contractors of workplace hazards, including a description of the labeling system used in the facility and of the availability of safety data sheets, must also be addressed. The written program must be made available upon request. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.
Translate