Violation Detail
Standard Cited: 19100119 D03 I B Process safety management of highly hazardous chemicals.
Inspection Nr: 1708799.015
Citation: 01003A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $16,131.00
Current Penalty: $11,250.00
Issuance Date: 04/09/2024
Nr Instances: 4
Nr Exposed: 20
Abatement Date: 05/24/2024
Gravity: 10
Report ID: 0625700
Contest Date:
Final Order: 06/28/2024
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/28/2024 | $11,250.00 | 05/24/2024 | Serious | |
Penalty | Z: Issued | 04/09/2024 | $16,131.00 | 05/24/2024 | Serious |
Text For Citation: 01 Item/Group: 003A Hazard:
29 CFR 1910.119(d)(3)(i)(B): Information concerning the equipment of the process did not include a complete and accurate piping and instrument diagram. On or about 11/07/2023, at No. 1 Platformer and No. 4 Crude units, the employer did not ensure that piping and instrument diagrams (P&IDs) were accurate. The P&IDs were not accurate as the following but not limited to: a. In P&ID 18-E-54-0020 Rev. 9 (Bates # 494), the pressure relief valve on the recycle discharge Hydrogen line (6"-HH-18-30040-N-BAA1) was labeled incorrectly. b. In P&ID 18-E-54-0020 Rev. 9 (Bates # 494), the pressure relief valve on the booster discharge Hydrogen line (4"-HH-18-10208-N-B2-1) was labeled incorrectly. c. In P&ID 18-E-54-3000 Rev. 21 (Bates # 501), the block valve up and down stream of 18-RV-06 were not labeled with car seal open (CSO). d. In P&ID 58-E-54-2003 Rev. 20 (Bates # 531), two (2) block valves are located down stream of PSV-58-05 were not labeled with car seal open (CSO).