Violation Detail
Standard Cited: 19100269 L01 II Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1691235.015
Citation: 01003A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $15,625.00
Current Penalty: $15,625.00
Issuance Date: 12/21/2023
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 03/03/2025
Gravity: 10
Report ID: 0522000
Contest Date: 01/18/2024
Final Order: 03/03/2025
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 03/03/2025 | $15,625.00 | 03/03/2025 | Serious | |
Penalty | C: Contested | 01/18/2024 | $15,625.00 | 01/19/2024 | Serious | |
Penalty | Z: Issued | 12/21/2023 | $15,625.00 | 01/19/2024 | Serious |
Text For Citation: 01 Item/Group: 003A Hazard:
29 CFR 1910.269(l)(1)(ii): Only qualified employees may work in areas containing unguarded, uninsulated energized lines or parts of equipment operating at 50 volts or more. a) On or before 08/09/2023, the employer did not ensure only qualified EEs were working in areas pulling energized socket meters that operated at 480v.