Violation Detail
Standard Cited: 19100107 B05 IV Spray finishing using flammable and combustible materials.
Inspection Nr: 1689764.015
Citation: 01003A
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $6,026.00
Current Penalty: $3,314.30
Issuance Date: 11/09/2023
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 1
Report ID: 0215800
Contest Date: 12/04/2023
Final Order: 03/08/2024
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 03/08/2024 | $3,314.30 | Serious | ||
Penalty | C: Contested | 12/04/2023 | $6,026.00 | Serious | ||
Penalty | Z: Issued | 11/09/2023 | $6,026.00 | Serious |
Text For Citation: 01 Item/Group: 003A Hazard:
29 CFR 1910.107(b)(5)(iv): Space within the spray booth on the downstream and upstream sides of filters were not protected with approved automatic sprinklers: a) Large Spray Booth, Dry Film, Anoplate Corporation, 459 Pulaski Street, Syracuse NY, 13204, on or about 8/9/2023: Automatic sprinkler head in the large spray booth was covered with paper and tape preventing employee protection in the event of a fire.