Violation Detail
Standard Cited: 19100219 C02 I Mechanical power-transmission apparatus.
Inspection Nr: 1651347.015
Citation: 01003A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $8,595.00
Current Penalty: $8,595.00
Issuance Date: 04/21/2023
Nr Instances: 1
Nr Exposed: 6
Abatement Date: 11/30/2023
Gravity: 5
Report ID: 0524700
Contest Date: 05/19/2023
Final Order: 09/20/2023
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | P: Petition to Mod Abatement | 09/29/2023 | $8,595.00 | 11/30/2023 | Serious | |
Penalty | J: ALJ Decision | 09/20/2023 | $8,595.00 | 10/02/2023 | Serious | |
Penalty | C: Contested | 05/19/2023 | $8,595.00 | 05/02/2023 | Serious | |
Penalty | Z: Issued | 04/21/2023 | $8,595.00 | 05/02/2023 | Serious |
Text For Citation: 01 Item/Group: 003A Hazard:
29 CFR 1910.219(c)(2)(i):All exposed part(s) of horizontal shafting seven (7) feet or less from floor or working platforms were not protected by stationary casing(s) enclosing shafting completely or by trough(s) enclosing sides and top or sides and bottom of shafting. a. The Ohio Art Company - Bryan, Ohio: On or about February 16, 2023, employees were exposed to injuries associated with being caught in rotating power-transmission shafting located the C6 Coater line. Horizontal shafting, used to convey metal sheets from the coater to the oven, was not guarded. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence, or written records.