Violation Detail
Standard Cited: 19100147 D03 The control of hazardous energy (lockout/tagout).
Inspection Nr: 1643645.015
Citation: 01003A
Citation Type: Serious
Abatement Date: 06/16/2023 2
Initial Penalty: $15,625.00
Current Penalty: $9,375.00
Issuance Date: 05/17/2023
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC): R
Gravity: 10
Report ID: 0419400
Contest Date:
Final Order: 07/21/2023
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/21/2023 | $9,375.00 | 06/16/2023 | Serious | |
Penalty | Z: Issued | 05/17/2023 | $15,625.00 | 06/16/2023 | Serious |
Text For Citation: 01 Item/Group: 003A Hazard:
29 CFR 1910.147(d)(3): All energy isolating devices that were needed to control the energy to the machine or equipment was not physically located and operated in such a manner as to isolate the machine or equipment from the energy source: (a) Blower Number 18 - On or about January 11, 2023, employees clearing a jam did not isolate the air, electrical and rotational energy sources prior to clearing jams exposing to a caught-in hazard.