Violation Detail
Standard Cited: 19100147 C04 II A The control of hazardous energy (lockout/tagout).
This violation item has been deleted.
Inspection Nr: 1631283.015
Citation: 01003A
Citation Type: Serious
Abatement Status:
Initial Penalty: $9,324.00
Current Penalty: $0.00
Issuance Date: 01/04/2023
Nr Instances: 8
Nr Exposed: 3
Abatement Date: 02/02/2023
Gravity: 5
Report ID: 0636900
Contest Date:
Final Order: 01/25/2023
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 01/25/2023 | $0.00 | 02/02/2023 | Serious | |
| Penalty | Z: Issued | 01/04/2023 | $9,324.00 | 02/02/2023 | Serious |
Text For Citation: 01 Item/Group: 003A Hazard:
29 CFR 1910.147(c)(4)(ii)(A): The energy control procedures did not contain a specific statement on the intended use of the procedure. On or about October 28, 2022, and at time prior thereto, the employer's SOP(s), Standard Work Visual Instructions also referred to as Inch Safe did not contain a specific statement on the intended use of the energy control procedure being utilized during the following processes listed below: a) Checking Surveillance System. b) Start-up. c) Machine Restart. d) Patch Hoist. e) Machine Stop. f) Shutdown; and g) Decurl Bar.