Violation Detail
Standard Cited: 19100268 B07 Telecommunications.
Inspection Nr: 1614382.015
Citation: 01003A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $15,625.00
Current Penalty: $9,328.00
Issuance Date: 02/10/2023
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 03/02/2023
Gravity: 10
Report ID: 0316700
Contest Date:
Final Order: 03/16/2023
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 03/16/2023 | $9,328.00 | 03/02/2023 | Serious | |
| Penalty | Z: Issued | 02/10/2023 | $15,625.00 | 03/02/2023 | Serious |
Text For Citation: 01 Item/Group: 003A Hazard:
29 CFR 1910.268(b)(7): The employer did not ensure that no employee approached or took any conductive object closer to any electrically energized overhead power lines and parts than prescribed in Table R-2 or in (i) - (iii) of this section: a) 130 Tressler Lane Spring Mills, PA Residential Cabin - An employee working in a bucket of a Chevy C5500 Utility Truck breached the approach distance and contacted the 7200-volt power line, on or about August 10, 2022., on or about August 10, 2022. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.