Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1608764.015
Citation: 01003A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $11,167.00
Current Penalty: $5,584.00
Issuance Date: 08/10/2022
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 09/30/2022
Gravity: 10
Report ID: 0524700
Contest Date:
Final Order: 09/06/2022
Related Event Code (REC): A;R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 09/06/2022 | $5,584.00 | 09/30/2022 | Serious | |
| Penalty | Z: Issued | 08/10/2022 | $11,167.00 | 08/26/2022 | Serious |
Text For Citation: 01 Item/Group: 003A Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct an annual or more frequent inspection of the energy control procedure to ensure that the procedure and requirements of this standard were followed: a.) Plas-Tec Corp. on or about July 13, 2022, at the address of 601 W. Indiana St. Edon, OH: The employer did not ensure periodic audits of the energy control procedures were completed at least annually. Employees are required to perform mold change activities on machines including but not limited to the #13 plastic injection machine which requires energy control procedures that have not been reviewed for deficiencies. In this condition employees were exposed to burn hazards.