Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1602901.015
Citation: 01003A
Citation Type: Other
Abatement Date: 01/29/2024 2
Initial Penalty: $7,458.00
Current Penalty: $15,000.00
Issuance Date: 12/12/2022
Nr Instances: 1
Nr Exposed: 20
Related Event Code (REC):
Gravity: 5
Report ID: 0213100
Contest Date: 01/10/2023
Final Order: 01/29/2024
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 01/29/2024 | $15,000.00 | 01/29/2024 | Other | |
Penalty | C: Contested | 01/10/2023 | $7,458.00 | 12/30/2022 | Serious | |
Penalty | Z: Issued | 12/12/2022 | $7,458.00 | 12/30/2022 | Serious |
Text For Citation: 01 Item/Group: 003A Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: (a) At the worksite (White Lake Facility): On or about 6/19/22, the employer did not develop, document, and utilize specific energy control procedures for machines such as but not limited to, refrigerated coolers and chiller unit(s).