Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 1581251.015
Citation: 01003A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $5,801.00
Current Penalty: $2,341.67
Issuance Date: 06/24/2022
Nr Instances: 3
Nr Exposed: 20
Abatement Date: 08/11/2022
Gravity: 5
Report ID: 0112000
Contest Date:
Final Order: 07/25/2022
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 07/25/2022 | $2,341.67 | 08/11/2022 | Serious | |
| Penalty | Z: Issued | 06/24/2022 | $5,801.00 | 08/11/2022 | Serious |
Text For Citation: 01 Item/Group: 003A Hazard:
29 CFR 1910.36(d)(1): Employee(s) were not able to open an exit route door from the inside at all times without keys, tools, or special knowledge: A. Production Area, near L7: On, or about, May 12, 2022, the exterior exit door was locked with a dead-bolt. B. Front Exit, Employee Break Area: On, or about, June 17, 2022, employees were required to depress a button located next to the door to allow the exit door to open. Abatement Note: Consult with the Fire Marshal regarding acceptable corrective action for Instance B. C. Side exit door, near old garage: On, or about, June 17, 2022, an exterior door located in the exit path was locked and provided with signage warning employees not to unlock the door.
Translate