Violation Detail
Standard Cited: 19100265 C18 I Sawmills.
Inspection Nr: 1564401.015
Citation: 01003A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $5,801.00
Current Penalty: $2,211.00
Issuance Date: 04/11/2022
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 07/01/2022
Gravity: 10
Report ID: 0316700
Contest Date:
Final Order: 05/09/2022
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/09/2022 | $2,211.00 | 07/01/2022 | Serious | |
| Penalty | Z: Issued | 04/11/2022 | $5,801.00 | 05/05/2022 | Serious |
Text For Citation: 01 Item/Group: 003A Hazard:
29 CFR 1910.265(c)(18)(i):Pulley(s), sprocket(s), sheave(s), drum(s) and block(s) of conveyor(s) were not provided with guarding to prevent the possibility of injury due to hands or parts of clothing being caught between the belt(s) and pulley(s) or chain(s) and sprockets: (a) EDGER DECK, OPERATORS AREA - Employees operated the edger machine where they accepted lumber from the head saw and fed it into the edger. The drive sprockets and discharge point for the transfer chain that moved lumber from the head saw to the edger deck was not equipped with guarding to prevent caught-in injuries between the sprocket and chain and the support structure, on or about November 17, 2021. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Translate