Violation Detail
Standard Cited: 19260451 B01 General requirements.
Inspection Nr: 1549835.015
Citation: 01003A
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $14,502.00
Current Penalty: $14,502.00
Issuance Date: 01/26/2022
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC): A
Gravity: 10
Report ID: 0521700
Contest Date:
Final Order: 02/22/2022
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 02/22/2022 | $14,502.00 | Serious | ||
Penalty | Z: Issued | 01/26/2022 | $14,502.00 | Serious |
Text For Citation: 01 Item/Group: 003A Hazard:
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii): a. On or about August 25, 2021, at the above addressed jobsite, employees were performing painting operations from a tubular welded frame scaffold on caster wheels, eight (8) feet four (4) inches above a lower level, that did not have the working level fully planked, thereby exposing the employees to fall hazards.