Violation Detail
Standard Cited: 19100036 B01 Design and construction requirements for exit routes.
Inspection Nr: 1531013.015
Citation: 01003A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $5,851.00
Current Penalty: $3,510.60
Issuance Date: 09/17/2021
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 11/15/2021
Gravity: 1
Report ID: 0419700
Contest Date:
Final Order: 10/14/2021
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 10/14/2021 | $3,510.60 | 11/15/2021 | Serious | |
Penalty | Z: Issued | 09/17/2021 | $5,851.00 | 10/14/2021 | Serious |
Text For Citation: 01 Item/Group: 003A Hazard:
29 CFR 1910.36(b)(1): At least two exit routes were not available in the workplace to permit prompt evacuation of employees and other building occupants during an emergency, except as allowed in paragraph (b)(3) of this section. The exit routes must be located as far away as practical from each other so that if one exit route is blocked by fire or smoke, employees can evacuate using the second exit route. a. Seasoning Platform: On or about 5/13/2021, the employer exposed employees to smoke inhalation and burn hazards, in that only one exit was provided off of the seasoning platform from which the employees were working.