Violation Detail
Standard Cited: 19100269 L01 III Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1507500.015
Citation: 01003A
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $13,653.00
Current Penalty: $13,653.00
Issuance Date: 05/28/2021
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 06/14/2022
Gravity: 10
Report ID: 0626300
Contest Date: 06/25/2021
Final Order: 04/14/2022
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 04/14/2022 | $13,653.00 | 06/14/2022 | Other | |
Penalty | C: Contested | 07/09/2021 | $13,653.00 | 06/24/2021 | Serious | |
Penalty | Z: Issued | 05/28/2021 | $13,653.00 | 06/24/2021 | Serious |
Text For Citation: 01 Item/Group: 003A Hazard:
29 CFR 1910.269(l)(1)(iii): Electric lines and equipment were not considered and treated as energized unless they had been deenergized in accordance with paragraph (d) or (m) of this section: (a) On or about December 19, 2020, an employee working and inspecting electrical equipment was exposed to an electrical hazard when the equipment was not treated as energized.