Violation Detail
Standard Cited: 19100119 J04 II Process safety management of highly hazardous chemicals.
Inspection Nr: 1503031.015
Citation: 01003A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $9,557.00
Current Penalty: $6,690.00
Issuance Date: 04/14/2021
Nr Instances: 6
Nr Exposed: 16
Abatement Date: 05/10/2021
Gravity: 10
Report ID: 0626300
Contest Date: 05/04/2021
Final Order: 10/08/2021
Related Event Code (REC): C
Emphasis:
Substance: 1190
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 10/08/2021 | $6,690.00 | 05/10/2021 | Serious | |
Penalty | C: Contested | 05/17/2021 | $9,557.00 | 05/10/2021 | Serious | |
Penalty | Z: Issued | 04/14/2021 | $9,557.00 | 05/10/2021 | Serious |
Text For Citation: 01 Item/Group: 003A Hazard:
29 CFR 1910.119(j)(4)(ii): The employer failed to ensure that mechanical integrity inspections and tests followed recognized and generally accepted good engineering practices (RAGAGEP). The employer did not follow RAGAGEP, such as but not limited to National Board Inspection Code (NBIC) Part 2- Inspection (2015), API Standard 653 (2009), Tank Inspection, Repair, Alteration, and Reconstruction, Sections 6 and 12, API Standard 510 (2009), Pressure Vessel Code: In-service Inspection, Rating, Repair, and Alteration, Sections 5 and 6. and API 570 (2016), Piping Inspection Code: In-service Inspection, Rating, Testing, Repair, and Alteration of Piping Systems, Sections 5 and 6 when pressure vessels and piping inspections were conducted that did not follow RAGAGEP. This condition exposed employees to the hazard(s) of ethylene oxide and isobutyryl chloride explosion and fire, overpressure, struck by ruptured vessel parts, toxic release, inhalation. The pressure vessel and tank inspections did not follow RAGAGEP include at least the following: (a) Reactor R-200 and all associated piping and instrumentation, the employer failed to conduct on-stream inspections, external inspection, thickness inspection, corrosion under insulation (CUI) inspection (i.e. nondestructive examinations, corrosion allowance, and thickness measurements) in accordance with a written inspection procedure/plan NBIC Part 2 (2015), API 510 (2006) Section 5 and 6 and API 570 Section 5 and 6 (2016); (b) Reactor R-600 and all associated piping and instrumentation; the employer failed to conduct failed to conduct internal, on-stream inspections, external inspection, thickness inspection, corrosion under insulation (CUI) inspection (i.e. nondestructive examinations, corrosion allowance, and thickness measurements) in accordance with a written inspection procedure/plan NBIC Part 2 (2015), API 510 (2006) Section 5 and 6 and API 570 Section 5 and 6 (2016); (c) Reactor R-700 and all associated piping and instrumentation; the employer failed to conduct failed to conduct internal, on-stream inspections, external inspection, thickness inspection, corrosion under insulation (CUI) inspection (i.e. nondestructive examinations, corrosion allowance, and thickness measurements) in accordance with a written inspection procedure/plan NBIC Part 2 (2015), API 510 (2006) Section 5 and 6 and API 570 Section 5 and 6 (2016); (d) Ethylene oxide storage tank T-100 and all piping and instrumentation; the employer failed to conduct external and internal inspections an in accordance with a written inspection procedure/plan NBIC Part 2 (2015), API 653 (2006) Section 6 and 12; (e) Ethylene oxide storage tank T-101 and piping and instrumentation; the employer failed to conduct external and internal inspections an in accordance with a written inspection procedure/plan NBIC Part 2 (2015), API 653 (2006) Section 6 and 12; (f) Benko Steam Hot Box Model S24 (hotbox) and all piping and instrumentation; the employer failed to conduct on-stream inspections, external inspection, thickness inspection, corrosion under insulation (CUI) inspection (i.e. nondestructive examinations, corrosion allowance, and thickness measurements) in accordance with a written inspection procedure/plan NBIC Part 2 (2015), API 510 (2006) Section 5 and 6 and API 570 Section 5 and 6 (2016). On or about October 16, 2020 and times prior thereto this condition exposed employees to the hazard(s) of explosion/fire, overpressure, struck by ruptured vessel parts, toxic release, inhalation, to the above process equipment containing ethylene oxide and isobutyryl alcohol.