Violation Detail
Standard Cited: 19100147 D The control of hazardous energy (lockout/tagout).
Inspection Nr: 1454912.015
Citation: 01003A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $13,494.00
Current Penalty: $12,500.00
Issuance Date: 06/29/2020
Nr Instances: 2
Nr Exposed: 28
Abatement Date: 07/24/2020
Gravity: 10
Report ID: 0524200
Contest Date: 07/22/2020
Final Order: 11/06/2020
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 11/06/2020 | $12,500.00 | 07/24/2020 | Serious | |
Penalty | C: Contested | 07/31/2020 | $13,494.00 | 07/24/2020 | Serious | |
Penalty | Z: Issued | 06/29/2020 | $13,494.00 | 07/24/2020 | Serious |
Text For Citation: 01 Item/Group: 003A Hazard:
29 CFR 1910.147(d): The established procedure for the application of energy control (the lockout or tagout procedures) did not cover the actions listed in and was not done in sequence as required by 29 CFR 1910.147(d)(1)-(6): The employer failed to implement energy control application steps as the machines were not isolated from all energy sources [per the 1910.147(d)(3) requirements]. As a result, the remaining applicable energy control elements, involving LOTO device application [(d)(4)], dissipation of residual energy [(d)(5)(i)], and verification of isolation [(d)(6)], were not implemented to protect employees from machine hazards. a) Press Department- On or about January 9, ,2020, employees were exposed to machine hazards associated with moving parts and pinch points from the unexpected start-up and energization of the Punch Press #164 when performing setup operations. b) Press Department- On or about January 10, 2020, employees were exposed to machine hazards associated with moving parts and pinch points from the unexpected start-up and energization of the Punch Press #118 when performing setup operations. c) On or about January 10, 2020, an employee performed set-up on a new press with one lock, and assisted unjamming at Press #115. no additional locks or devices for application during lockout were used. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.