Violation Detail
Standard Cited: 19100147 C07 I A The control of hazardous energy (lockout/tagout).
Inspection Nr: 1451131.015
Citation: 01003A
Citation Type: Serious
Abatement Status: Not Completed - AD Discretion
Initial Penalty: $13,494.00
Current Penalty: $0.00
Issuance Date: 03/16/2020
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 03/20/2020
Gravity: 10
Report ID: 0213100
Contest Date: 04/06/2020
Final Order: 11/02/2020
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 11/02/2020 | $0.00 | 03/20/2020 | Serious | |
Penalty | C: Contested | 04/13/2020 | $13,494.00 | 03/20/2020 | Serious | |
Penalty | Z: Issued | 03/16/2020 | $13,494.00 | 03/20/2020 | Serious |
Text For Citation: 01 Item/Group: 003A Hazard:
29 CFR 1910.147(c)(7)(i)(A): Authorized employee(s) did not receive training in the recognition of applicable hazardous energy sources, the type and magnitude of the energy available in the workplace, and the methods and means necessary for energy isolation and control: a) Duo Matic Machine - On or prior to December 13, 2019, employees performed service and maintenance activities on the Duo Matic Machine (The Duo Matic Assembly System is manufactured by Viking Engineering and Development, Patent #3,945,549. The machine label also includes 950-30-1147). The company did not provide adequate training for authorized employees.